Skip to Content
chevron-left chevron-right chevron-up chevron-right chevron-left arrow-back star phone quote checkbox-checked search wrench info shield play connection mobile coin-dollar spoon-knife ticket pushpin location gift fire feed bubbles home heart calendar price-tag credit-card clock envelop facebook instagram twitter youtube pinterest yelp google reddit linkedin envelope bbb pinterest homeadvisor angies
Lacoste Cover Photo

Lacoste: MUNNLANE Workplace managed with SPS

"Lacoste Summer Collection" Display

Construction:
-All Lucite Custom routed Displays
-Back Light Oversized Graphics. Both indoor and for outdoor
-Mannequins
Installation:
-Installation of ALL elements done by SPS – 1 Day Installation
Project Management:
-From Concept to Completion including all installation by our installers. Dedicated Project manager from placing the order to final completion.
Design
-“Collaboration” with SPS on design provided by client, All prepress and art file, layout and prepress done by SPS

Kiehls Cover Photo

Kiehl’s: MUNNLANE Workplace managed with SPS

Kiehl’s 14th Street Store Holiday

Construction:
Custom Designed outdoor rated Poly (eco-friendly material) Heated and bent by hand into “Holiday Bows”
Installation:
-Installation of ALL elements done by SPS – 6-7 Hour Installation
Project Management:
-From Concept to Completion including all installation by our installers. Dedicated Project manager from placing the order to final completion.
Design:
-Design done by SPS as well as all prepress and art file, layout and prepress done by SPS

SK-II-Cover-Photo

SK-11

Soho Penthouse Takeover

Construction-
(Space was empty)
SPS Produced:
-All Display walls
-All Podiums, vitrines and stations
-Acrylic tables
-Completely custom Ceiling
-Dynamic lighting throughout entire event space
Installation:
-Installation of ALL elements done by SPS – 2 Night Installation
Project Management:
-From Concept to Completion including all installation by our installers. Dedicated Project manager from placing the order to final completion.
Design:
“Collaboration” with SPS on design provided by client, All prepress and art file, layout and prepress done by SPS

Chloe Cover Photo

Chloe: MUNNLANE Workplace managed with SPS

In Store Bloomingdales takeover

-Construction
-Millwork
-Signage and 3D letters
-Graphic prints
-Custom produced clear globes with inserts
-Sourcing “live” foliage for the display
-Installation
All installation of fabricated pieces done by SPS – 2 day installation
-Project Management:
-From Concept to Completion including all installation by our installers. Dedicated Project manager from placing the order to final completion.
-Design:
Design provided by client, All prepress and art file layout and prepress done by SPS

Bulgari-Cover-Photo

Bulgari

Bulgari

General Contractor
MUNNLANE Workplace is responsible for scheduling and overseeing the day-to-day activities of this project.
Construction:
(Space was Hotel Penthouse Room – 8,000 sq/feet)
SPS Produced:
-All Display walls and channel lettering
-All custom Podiums, vitrines and stanchions
-All Custom carpeting made to Specific Pantone Color
-All Floral arrangements
-Dynamic lighting throughout entire event space Installation:
Installation:
-Installation of ALL elements done by SPS – 2 Night Installation
Project Management:
-From Concept to Completion including all installation by our installers. Dedicated Project manager from placing the order to final completion.
Design:
“Collaboration” with SPS on design provided by client, All prepress and art file, layout and prepress done by SPS

Madewell Cover Photo

Madewell

Madewell

Coming Soon